The demolition project was strategically planned, and although it may appear chaotic, every aspect was carefully considered. The photos show the process, revealing that even the refrigerator, stove, and kitchen sink were successfully removed. One of the challenges we encountered was the presence of 9 inches of groundwater covering the slab, which had to be removed without direct visibility.
Pictures below show some cool angles of the project before, during, and after the demolition.